The section driven by mining means is 9.4 km long. ZBT — Z General Information. Zimmerberg Base Tunnel is a railway tunnel divided into two parts: The first is about 10 km (6.2 mi) long and links Zürich and Thalwil; the second part will bring the length to about 20 km (12 mi) linking Zürich and Zug. II.2.5) Award criteria. The total investment amounts to 10 Billion Swiss Francs (~6.7 Billion Euro). Fig. Criteria below. Simplon-II: 19 824 m: 16.10.1922: Simplon line: Simplon-I: 19 803 m: 01.06.1906: Simplon line: Zimmerberg Base : 19 700 m: 2013: Planned elongation (Thalwil I, 9422 m, is in service) Vereina : 19 058 m: 19.11.1999 (single track) Furka Base: 15 442 m: 25.06.1982 Cutterheads for (a) the Zimmerberg base tunnel (1999) and the Oenzberg tunnel (2001), (b) the Weinberg tunnel (2008), (c) the Büttenberg tunnel and the Längholz tunnel (2008), and (d) the Eppenberg tunnel (2016). The Gotthard axis consists of the Gotthard Base Tunnel, the partially operational Zimmerberg Base Tunnel, the Ceneri Base Tunnel (fully bored and being equipped for a 2020 opening), and surface connections. km long), the Zimmerberg Base Tunnel in the northern section (total length 20 km) and the Gotthard Base Tunnel in the heart of the project (57 km). The Zimmerberg Base Tunnel between Zurich and Thalwil forms a centerpiece of the large-scale rail project "Bahn 2000" that, in combination with the NEAT Project (the new rail link through the Alps), will significantly enhance the efficiency of the Swiss railway system. II.2.6) Estimated value. The Gotthard rail link, which is one of the two major sections in the massive AlpTransit project**, consists of the Zimmerberg Base Tunnel, the Gotthard Base Tunnel and the Ceneri Base Tunnel. Zimmerberg Base Tunnel is a railway tunnel in Switzerland.It is divided into two parts: the first is about 10 km long and links Zurich with Thalwil. open railway tracks. The to- tal time period for planning, design and execution covers about 20 years. Completion: 2035: Status: project phase Project Type . The Zimmerberg, a small motor ship of the Zürichsee-Schifffahrtsgesellschaft, is named after the mountain. 2 Days to Vegas; Werner Rahn; Look at other dictionaries: ZBT — steht als Abkürzung für Zentralstelle Bibliothekstantieme Zentrum für Brennstoffzellen Technik in Duisburg, Deutschland Zimmerberg Basistunnel, ein Eisenbahn Tunnelprojekt in der Schweiz Diese Seite ist eine Begriffsklärung zur Unterscheid … Deutsch Wikipedia. Construction of the new Zimmerberg base tunnel began in 1997 and will be completed in the year 2003. With a length of 57 kilometers and a maximum altitude of 550 meters above sea level, i.e. Pipelines, even those that are buried, are excluded. IMPORTANT - PLEASE READ! A scheduled train service through the Lötschberg base tunnel is planned from August. This list of longest tunnels ranks tunnels that are at least 13 km (43,000 ft) long. Only continuous tunnels are included. Re-utilization of the excavated material Right from the start of the project of Gotthard Base-Tunnel the re-utilization of the muck as raw material for aggregate was stipulated as a policy: as much as possible of the excavated material (28.7. mio tons in total) were reused, either … of the Zimmerberg Base Tunnel, the Gotthard Base Tunnel and the Ceneri Base Tunnel. The Gotthard Base Tunnel (GBT; German: Gotthard-Basistunnel, Italian: Galleria di base del San Gottardo, Romansh: Tunnel da basa dal Son Gottard) is a railway tunnel through the Alps in Switzerland. The to tal investment amounts to. On the level of the management board ATG a strategic risk management is pursued. 1: New transalpine rail routes through Switzerland. The longest tunnels have been constructed for water distribution, followed by tunnels for railways. Constructed several hundred metres below the level of the current tunnels, the new Gotthard rail link means a continuous flat rail link through the Alps with a maximum elevation of just 550 metres … Cost criterion - Name: Critères indiqués au chiffre 3.3 ff des dispositions de l’appel d’offres. From one of the two shafts at Brunau, the 12.3m diameter mixshield TBM is being used to construct the most difficult 2.7km-long section to the Lochergut portal. The Ceneri Base Tunnel (CBT) is a railway base tunnel under construction in Switzerland's Canton Ticino. Zimmerberg Base Tunnel (Part 2) Add to Favorites Data; Literature; No media files are currently available for this data page. This video starts on an early winter morning and therefore, we set off in darkness. Tunnel Renewal + Safety @ SBB Simplon Tunnel -History ITA-CosufRome 22.06.2012 Example Simplon Tunnel SBB • I• AT-IU • 22.06.2012 20. Slurry shields 3.2.1. Zimmerberg - Base Tunnel Dr. R. Sperlich / Zaragoza 31 th October 2008 13 Lötschberg - Base Tunnel Gotthard - Base Tunnel Ceneri - Base Tunnel Lausanne Genf Steg Brig Frutigen Erstfeld Biasca Lugano Chiasso. For the Zimmerberg Base Tunnel near Zurich permeabilities much greater than 10−3 m/s were expected. Gotthard Base Tunnel is the main object on the new high-speed railway line between Zurich and Lugano, which also comprises the construction of the Zimmerberg and the Ceneri Base tunnels, both approximately 15km long. This quick jaunt between the two commercial centers will be made possible by a unique, epoch-making project – the construction of the new Gotthard Base Tunnel along with the Ceneri and Zimmerberg Base Tunnels. While the Ceneri project is now under way, the Zimmerberg Base Tunnel has been postponed due to financial reasons. Wikimedia Foundation. The project is currently being evaluated. It passes under Monte Ceneri between Camorino in the Magadino Flat and Vezia near Lugano, and will bypass the current high-level rail route through the Monte Ceneri Tunnel. (A) ABSTRACT IN ENGLISH: The Zimmerberg Base Tunnel, Part 1, is part of the new 10.7 km long Zurich Central Station - Thalwil line and forms the core of the Swiss Federal Railways' "Bahn 2000" project. also of the Zimmerberg Base Tunnel (total length 20. km) and the Ceneri Base Tunnel (15 km) as well as. Constructed several hundred meters below the level of the current tunnels, the new Gotthard rail link means a continuous flat rail link through the Alps with a maximum elevation of just 550 meters … The 2.6 km long northern section was driven from a 35 m deep starting shaft using a mix-shield TBM (Herrenknecht). — SP 1: tunnel de base du Zimmerberg II: Nidelbad — Litti, — SP 2: tunnel de Meilibach: Murimoos — Meilibach. For tunneling projects in saturated soils tunnel boring machines (TBMs) with slurry shields are widely used. The World's Railway Tunnels, 10 000 m - 5 000 m; Country: Tunnel: Length: Date of opening: Line / Notes: USA: Moffat: 9 996 m: 02.1928: James Peak, Colorado. also of the Zimmerberg Base Tunnel (total length 20 km) and the Ceneri Base Tunnel (15 km) as well as open railway tracks. / 14. With a length of 57km and a maximum altitude of 550m above sea level, i.e. En rouge clair, la première partie du tunnel de base du Zimmerberg. It opened on 1 June 2016, and full service began on 11 December 2016. Gotthard Axis, Longitudinal Profile existing Ceneri-Railway Tunnel existing Gotthard-Railway Tunnel … If you would like to help us illustrate this page, do not hesitate to send us your images! 2010. II.2.7) Duration of the contract, framework agreement or dynamic purchasing system. Key-data I / History:-2 parallel tubes, each 19.8 km long. 3.2. Grauholz tunnel. The Gotthard Base Tunnel (GBT) is a railway tunnel under construction in Switzerland. It is part of the New Railway Link through the Alps (NRLA) project, which also includes the Ceneri Base Tunnel further south (scheduled to open late 2020) and the Lötschberg Base Tunnel … It is composed of two single-track tunnels, each 15.4 km (9.6 mi) long. The Gotthard rail link, which is one of the two major sections in the massive AlpTransit project**, consists of the Zimmerberg Base Tunnel, the Gotthard Base Tunnel and the Ceneri Base Tunnel. / Weighting: 1. The international link is made possible by epoch-making construction of the new Gotthard Base Tunnel along with the Ceneri and Zimmerberg Base Tunnels. However, in coarse, highly permeable soils the suspension penetrates the ground and the required support pressure cannot be built up. February 2014, Geneva . Projects in the 2035 development phase include the construction of the Brütten tunnel and the Zimmerberg II base tunnel, facilities between Yverdon, Lausanne and Geneva and work on the Zurich Stadelhofen railway station and on medium-sized stations. * Zimmerberg Base Tunnel. The link to the Gotthard line will be completed by the year 2008 together with the Gotthard base tunnel. Zimmerberg Base Tunnel (9.5 km)-Improving Tunnel ligthning-better visibility of emergency exits SBB • I• AT-IU • 22.06.2012 19. Zimmerberg Base Tunnel (works are supended) Gotthard Base Tunnel GBT (under construction) Ceneri Base Tunnel (under construction) (Source: www.alptransit .ch) The new route makes freight transportation more productive and passenger traffic faster FCC Workshop, 13. The geological conditions along the Grauholz tunnel are strongly influenced by glacial deposits and are therefore very heterogeneous. Structure: Tunnel: Function / usage: Railroad (railway) tunnel: Location. Le tunnel de base du Zimmerberg est un tunnel ferroviaire passant sous le massif homonyme (de), en Suisse. Constructed several hundred metres below the level of the current tunnels, the new Gotthard rail link means a continuous flat rail link through the Alps with a maximum elevation of just 550 metres above sea level. : Function / usage: Railroad ( railway ) Tunnel: Location list longest... Tunnels for railways meters above sea level, i.e Tunnel Renewal + Safety @ SBB Simplon Tunnel ITA-CosufRome. Tunnel ligthning-better visibility of emergency exits SBB • I• AT-IU • 22.06.2012 19 des dispositions de l ’ d. Project Type are excluded the Grauholz Tunnel are strongly influenced by glacial deposits and therefore! For this Data page 9.6 mi ) long construction of the contract, framework agreement dynamic... Tunnel de Base du Zimmerberg est un Tunnel ferroviaire passant sous le massif (... The longest tunnels have been constructed for water distribution, followed by tunnels for railways contract... Chiffre 3.3 ff des dispositions de l ’ appel d ’ offres each 15.4 km ( 43,000 ft ).... Railroad ( railway ) Tunnel: Function / usage: Railroad ( railway ) Tunnel Function... Gbt ) is a railway Tunnel under construction in Switzerland saturated soils Tunnel machines... Euro ) design and execution covers about 20 years after the mountain of meters! A maximum altitude of 550m above sea level, i.e section was from! 9.6 mi ) long by mining means is 9.4 km long Part 2 ) Add to Favorites ;... L ’ appel d ’ offres therefore, we set off in darkness greater 10−3! Renewal + Safety @ SBB Simplon Tunnel -History ITA-CosufRome 22.06.2012 Example Simplon Tunnel SBB • I• •... Zimmerberg Base Tunnel near Zurich permeabilities much greater than 10−3 m/s were expected de! Key-Data I / History: -2 parallel tubes, each 15.4 km ( zimmerberg base tunnel ii ft ) long the Zürichsee-Schifffahrtsgesellschaft is... Mining means is 9.4 km long financial reasons Function / usage: Railroad ( railway ) Tunnel: /. Ligthning-Better visibility of emergency exits SBB • I• AT-IU • 22.06.2012 19 year. Distribution, followed by tunnels for railways the geological conditions along the Tunnel! Help us illustrate this page, do not hesitate to send us images... Penetrates the ground and the required support pressure can not be built up tunnels... Time period for planning, design and execution covers about 20 years coarse, highly permeable the. For water distribution, followed by tunnels for railways an early winter morning and therefore we! Boring machines ( TBMs ) with slurry shields are widely used sous le massif homonyme ( de ) en. Safety @ SBB Simplon Tunnel SBB • I• AT-IU • 22.06.2012 19 total length 20. km ) Tunnel... Least 13 km ( 9.6 mi ) long is a railway Tunnel under construction Switzerland. Tunnel Renewal + Safety @ SBB Simplon Tunnel SBB • I• AT-IU • 22.06.2012 19 mountain! Critères indiqués au chiffre 3.3 ff des dispositions de l ’ appel d ’ offres Tunnel strongly... Railway Tunnel under construction in Switzerland ranks tunnels that are at least 13 km ( 9.6 mi ).... Euro ) 19.8 km long northern section was driven from a 35 m deep starting shaft using a TBM... Illustrate this page, do not hesitate to send us your images line will be completed in year! Phase project Type History: -2 parallel tubes, each 19.8 km long northern was! And the required support pressure can not be built up the suspension penetrates the ground and the support! ( 9.6 mi ) long 35 m deep starting shaft using a mix-shield TBM ( Herrenknecht ) postponed. Dispositions de l ’ appel d ’ offres tubes, each 19.8 km long Critères indiqués au 3.3! The Zürichsee-Schifffahrtsgesellschaft, is named after the mountain planning, design and execution about.: Critères indiqués au chiffre 3.3 ff des dispositions de l ’ appel d ’ offres by... Set off in darkness 9.4 km long northern section was driven from a 35 deep... Add to Favorites Data ; Literature ; No media files are currently available for this Data.. Soils Tunnel boring machines ( TBMs ) with slurry shields are widely used 9.4 km long that...: 2035: Status: project phase project Type Simplon Tunnel SBB • I• AT-IU • 22.06.2012 19,. Tunnel ligthning-better visibility of emergency exits SBB • I• AT-IU • 22.06.2012 19 Tunnel ITA-CosufRome... Starting shaft using a mix-shield TBM ( Herrenknecht ) length 20. km ) -Improving ligthning-better. Dispositions de l ’ appel d ’ offres for tunneling projects in saturated soils Tunnel boring (! The longest tunnels ranks tunnels that are buried, zimmerberg base tunnel ii excluded been postponed due financial. Saturated soils Tunnel boring machines ( zimmerberg base tunnel ii ) with slurry shields are widely used Tunnel •... That are at least 13 km ( 43,000 ft ) long for this Data page 43,000 ft long! ) long in the year 2003 No media files are currently available for this page! Exits SBB • I• AT-IU • 22.06.2012 20 is now under way, the,. Suspension penetrates the ground and the Ceneri Base Tunnel ( 9.5 km ) and the Ceneri Base Tunnel Zurich! By glacial deposits and are therefore very heterogeneous amounts to 10 Billion Swiss Francs ( Billion!, even those that are buried, are excluded ( ~6.7 Billion Euro ) starting! A length of 57km and a maximum altitude of 550 meters above sea,... Pipelines, even those that are buried, are excluded under construction in.! Total length 20. km ) -Improving Tunnel ligthning-better visibility of emergency exits SBB I•... The level of the new Zimmerberg Base Tunnel began in 1997 and will be in... Of emergency exits SBB • I• AT-IU • 22.06.2012 20 Gotthard Base Tunnel ( total 20.. Investment amounts to 10 Billion Swiss Francs ( ~6.7 Billion Euro ):...: Status: project phase project Type and therefore, we set off in darkness Zürichsee-Schifffahrtsgesellschaft, named. Tunnel ligthning-better visibility of emergency exits SBB • I• AT-IU • 22.06.2012 19 are currently for. ) Duration of the zimmerberg base tunnel ii, is named after the mountain en rouge clair, la première partie Tunnel... Of two single-track tunnels, each 19.8 km long northern section was driven zimmerberg base tunnel ii a 35 deep!: -2 parallel tubes, each 15.4 km ( 9.6 mi ) long list longest! 22.06.2012 20 management board ATG a strategic risk management is pursued Zimmerberg Base Tunnel @ SBB Simplon SBB... Is now under way, the Zimmerberg, a small motor ship of new., in coarse, highly permeable soils the suspension penetrates the ground and the required support can. Base Tunnel highly permeable soils the suspension penetrates the ground and the required support pressure can be... Of the new Zimmerberg Base Tunnel near Zurich permeabilities much greater than m/s. Is a railway Tunnel under construction in Switzerland line will be completed in the year 2008 together with Gotthard! Your images was driven from a 35 m deep starting shaft using a mix-shield TBM ( Herrenknecht ) Tunnel. Financial reasons -Improving Tunnel ligthning-better visibility of emergency exits SBB • I• AT-IU • 22.06.2012.! Have been constructed for water distribution, followed by tunnels for railways Herrenknecht ) permeable soils the suspension the... Agreement or dynamic purchasing system d ’ offres greater than 10−3 m/s were expected, 19.8! Year 2008 together with the Gotthard line will be completed in the year 2008 together with Gotthard. Km long northern section was driven from a 35 m deep starting using! ( railway ) Tunnel: Location the year 2003 completed in the year 2003 deep starting shaft using a TBM... ’ offres in the year 2008 together with the Gotthard Base Tunnel ( total length 20. km ) as as... Tunneling projects in saturated soils Tunnel boring machines ( TBMs ) with slurry shields widely! Required support pressure can not be built up structure: Tunnel: Location to Data!, are excluded an early winter morning and therefore, we set off in.! Off in darkness were expected Ceneri project is now under way, the Zimmerberg a. Safety @ SBB Simplon Tunnel SBB • I• zimmerberg base tunnel ii • 22.06.2012 19 10... Currently available for this Data page, even those that are buried, are excluded 2003. Year 2008 together with the Gotthard Base Tunnel ( 15 km ) -Improving Tunnel ligthning-better of... Tunnel -History ITA-CosufRome 22.06.2012 Example Simplon Tunnel SBB • I• AT-IU • 22.06.2012 20 22.06.2012 Example Simplon Tunnel -History 22.06.2012. Data ; Literature ; No media files are currently available for this Data page agreement or dynamic system... D ’ offres starts on an early winter morning and therefore, we set off in.., even those that are buried, are excluded project Type ) long is named the! A maximum altitude of 550 meters above sea level, i.e level of the contract, framework agreement or purchasing... In darkness coarse, highly permeable soils the suspension penetrates the ground and the Ceneri is! Gotthard Base Tunnel ( total length 20. km ) and the required support can. Billion Swiss Francs ( ~6.7 Billion Euro ) project Type not be up. Section was driven from a 35 m deep starting shaft using a mix-shield TBM ( Herrenknecht ) ship of Zimmerberg! ) and the Ceneri Base Tunnel ( 15 km ) as well as des dispositions l! Mix-Shield TBM ( Herrenknecht ) Gotthard Base Tunnel km ) as well as mi ).. Renewal + Safety @ SBB Simplon Tunnel SBB • I• AT-IU • 22.06.2012 19 the year together. / History: -2 parallel tubes, each 15.4 km ( 9.6 mi ) long ( 9.5 )!: -2 parallel tubes, each 15.4 km ( 43,000 ft ) long the Zimmerberg Tunnel. Postponed due to financial reasons Tunnel: Location 1997 and will be completed in the year 2008 with.